{"id":119509,"date":"2026-03-20T18:07:12","date_gmt":"2026-03-21T00:07:12","guid":{"rendered":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/?p=119509"},"modified":"2026-03-20T18:07:14","modified_gmt":"2026-03-21T00:07:14","slug":"reportan-avance-del-50-en-construccion-del-c4-sur-de-monterrey","status":"publish","type":"post","link":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/reportan-avance-del-50-en-construccion-del-c4-sur-de-monterrey\/","title":{"rendered":"Reportan avance del 50% en construcci\u00f3n del C4 sur de Monterrey"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">20 de marzo de 2026<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Con un avance del 50 por ciento, la construcci\u00f3n del Centro de Comando, Control, Comunicaci\u00f3n y C\u00f3mputo (C4) en la zona sur de Monterrey contin\u00faa desarroll\u00e1ndose tras dos meses de haber iniciado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El alcalde Adri\u00e1n de la Garza encabez\u00f3 este viernes un recorrido de supervisi\u00f3n en el sitio, donde verific\u00f3 el progreso de la obra junto al secretario de Obras P\u00fablicas, <a href=\"\/\/generic-entity?number=1\">Nazario Pineda<\/a>, adem\u00e1s de otros funcionarios municipales.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La construcci\u00f3n, que inici\u00f3 el 18 de enero, se integra a la estrategia \u201cEscudo\u201d, impulsada por la administraci\u00f3n municipal con el prop\u00f3sito de fortalecer las acciones de vigilancia y atenci\u00f3n en la zona sur.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El inmueble se levanta en la colonia Las Diligencias, sobre una superficie de 6 mil 750 metros cuadrados, y contar\u00e1 con tres niveles que albergar\u00e1n un total de 61 \u00e1reas operativas. Entre ellas se contemplan espacios para atenci\u00f3n de denuncias (CODE), monitoreo, funciones judiciales y \u00e1reas destinadas a Protecci\u00f3n Civil.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">De acuerdo con el proyecto, la planta baja estar\u00e1 enfocada en la atenci\u00f3n a la ciudadan\u00eda, mientras que el s\u00f3tano incluir\u00e1 zonas de registro, barandilla, detenci\u00f3n preventiva y revisi\u00f3n m\u00e9dica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En cuanto al desarrollo de la obra, se inform\u00f3 que la barda perimetral ya fue concluida y la cimentaci\u00f3n est\u00e1 terminada. El edificio principal presenta un avance del 43 por ciento; el muro de contenci\u00f3n principal y la fosa s\u00e9ptica alcanzan el 90 por ciento, mientras que la estructura met\u00e1lica registra un progreso del 50 por ciento.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"119512\" src=\"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/0ec3bc0f-70a9-4b6a-91f8-d565913f5464-1024x682.jpeg\" alt=\"\" class=\"wp-image-119512\" srcset=\"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/0ec3bc0f-70a9-4b6a-91f8-d565913f5464-1024x682.jpeg 1024w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/0ec3bc0f-70a9-4b6a-91f8-d565913f5464-300x200.jpeg 300w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/0ec3bc0f-70a9-4b6a-91f8-d565913f5464-768x512.jpeg 768w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/0ec3bc0f-70a9-4b6a-91f8-d565913f5464-1536x1023.jpeg 1536w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/0ec3bc0f-70a9-4b6a-91f8-d565913f5464-1170x780.jpeg 1170w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/0ec3bc0f-70a9-4b6a-91f8-d565913f5464.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"119510\" src=\"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/1c318dbb-e1e6-4c03-8caf-da580fb7a758-1024x682.jpeg\" alt=\"\" class=\"wp-image-119510\" srcset=\"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/1c318dbb-e1e6-4c03-8caf-da580fb7a758-1024x682.jpeg 1024w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/1c318dbb-e1e6-4c03-8caf-da580fb7a758-300x200.jpeg 300w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/1c318dbb-e1e6-4c03-8caf-da580fb7a758-768x512.jpeg 768w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/1c318dbb-e1e6-4c03-8caf-da580fb7a758-1536x1023.jpeg 1536w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/1c318dbb-e1e6-4c03-8caf-da580fb7a758-1170x780.jpeg 1170w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/1c318dbb-e1e6-4c03-8caf-da580fb7a758.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>20 de marzo de 2026 Con un avance del 50 por ciento, la construcci\u00f3n del Centro de Comando, Control, Comunicaci\u00f3n y C\u00f3mputo (C4) en la zona sur de Monterrey contin\u00faa desarroll\u00e1ndose tras dos meses de haber iniciado. El alcalde Adri\u00e1n de la Garza encabez\u00f3 este viernes un recorrido de supervisi\u00f3n en el sitio, donde verific\u00f3 [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":119511,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"link","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-119509","post","type-post","status-publish","format-link","has-post-thumbnail","hentry","category-locales","post_format-post-format-link","has-thumb"],"_links":{"self":[{"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/posts\/119509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/comments?post=119509"}],"version-history":[{"count":1,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/posts\/119509\/revisions"}],"predecessor-version":[{"id":119513,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/posts\/119509\/revisions\/119513"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/media\/119511"}],"wp:attachment":[{"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/media?parent=119509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/categories?post=119509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/tags?post=119509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}