{"id":119694,"date":"2026-03-26T21:50:52","date_gmt":"2026-03-27T03:50:52","guid":{"rendered":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/?p=119694"},"modified":"2026-03-26T21:50:52","modified_gmt":"2026-03-27T03:50:52","slug":"avanza-a-mas-del-50-construccion-del-c4-norte-en-monterrey","status":"publish","type":"post","link":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/avanza-a-mas-del-50-construccion-del-c4-norte-en-monterrey\/","title":{"rendered":"Avanza a m\u00e1s del 50% construcci\u00f3n del C4 norte en Monterrey"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">26 de marzo de 2026<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La construcci\u00f3n del Centro de Comando, Control, Comunicaci\u00f3n y C\u00f3mputo (C4) en la zona norte de Monterrey registra un avance del 51 por ciento, de acuerdo con la supervisi\u00f3n realizada este jueves por el alcalde Adri\u00e1n de la Garza.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Acompa\u00f1ado por el secretario de Obras P\u00fablicas, Nazario Pineda, el edil recorri\u00f3 la obra ubicada en la colonia Plutarco El\u00edas Calles, donde constat\u00f3 el progreso en distintas \u00e1reas del proyecto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Durante la visita, De la Garza destac\u00f3 que este complejo forma parte de un plan integral de seguridad que contempla la instalaci\u00f3n de dos centros de monitoreo en puntos estrat\u00e9gicos de la ciudad. \u201cEstamos construyendo no uno, sino dos C4 en las dos entradas a Monterrey, en el norte y el sur y en pocos meses ya estar\u00e1n operando\u201d, se\u00f1al\u00f3.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El municipio destina una inversi\u00f3n superior a los 200 millones de pesos para la edificaci\u00f3n, la cual abarcar\u00e1 3 mil metros cuadrados dentro de un predio de 7 mil metros cuadrados. Este centro ser\u00e1 clave dentro de la Estrategia Escudo, impulsada por la actual administraci\u00f3n para fortalecer la seguridad en la ciudad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El proyecto contempla la coordinaci\u00f3n de m\u00e1s de 70 servicios municipales, lo que permitir\u00e1 ofrecer atenci\u00f3n integral tanto a residentes como a visitantes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En el recorrido se observaron trabajos en la cimentaci\u00f3n del edificio principal, la colocaci\u00f3n de estructura met\u00e1lica, la construcci\u00f3n del muro de contenci\u00f3n y la habilitaci\u00f3n de \u00e1reas sanitarias.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una vez concluido, el C4 contar\u00e1 con espacios de estacionamiento para unidades policiales y ciudadanos, adem\u00e1s de barda perimetral, oficinas y \u00e1reas operativas destinadas a reforzar la vigilancia en el sector norte de Monterrey.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"119696\" src=\"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/8c49356c-03d7-4204-8643-642a7fc09373-1024x682.jpeg\" alt=\"\" class=\"wp-image-119696\" srcset=\"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/8c49356c-03d7-4204-8643-642a7fc09373-1024x682.jpeg 1024w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/8c49356c-03d7-4204-8643-642a7fc09373-300x200.jpeg 300w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/8c49356c-03d7-4204-8643-642a7fc09373-768x512.jpeg 768w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/8c49356c-03d7-4204-8643-642a7fc09373-1536x1023.jpeg 1536w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/8c49356c-03d7-4204-8643-642a7fc09373-1170x780.jpeg 1170w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/8c49356c-03d7-4204-8643-642a7fc09373.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" data-id=\"119695\" src=\"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/cb3ef3c5-bcd7-458f-9159-bea3b960bf11-1024x682.jpeg\" alt=\"\" class=\"wp-image-119695\" srcset=\"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/cb3ef3c5-bcd7-458f-9159-bea3b960bf11-1024x682.jpeg 1024w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/cb3ef3c5-bcd7-458f-9159-bea3b960bf11-300x200.jpeg 300w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/cb3ef3c5-bcd7-458f-9159-bea3b960bf11-768x512.jpeg 768w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/cb3ef3c5-bcd7-458f-9159-bea3b960bf11-1536x1023.jpeg 1536w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/cb3ef3c5-bcd7-458f-9159-bea3b960bf11-1170x780.jpeg 1170w, https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-content\/uploads\/2026\/03\/cb3ef3c5-bcd7-458f-9159-bea3b960bf11.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>26 de marzo de 2026 La construcci\u00f3n del Centro de Comando, Control, Comunicaci\u00f3n y C\u00f3mputo (C4) en la zona norte de Monterrey registra un avance del 51 por ciento, de acuerdo con la supervisi\u00f3n realizada este jueves por el alcalde Adri\u00e1n de la Garza. Acompa\u00f1ado por el secretario de Obras P\u00fablicas, Nazario Pineda, el edil [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":119697,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"link","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-119694","post","type-post","status-publish","format-link","has-post-thumbnail","hentry","category-locales","post_format-post-format-link","has-thumb"],"_links":{"self":[{"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/posts\/119694","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/comments?post=119694"}],"version-history":[{"count":1,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/posts\/119694\/revisions"}],"predecessor-version":[{"id":119698,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/posts\/119694\/revisions\/119698"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/media\/119697"}],"wp:attachment":[{"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/media?parent=119694"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/categories?post=119694"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elsemanariodenuevoleon.com.mx\/portal\/wp-json\/wp\/v2\/tags?post=119694"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}